Steam heating coils built to the machine duct, in series with a Japanese equipment maker

| Requirement | What it means in the design |
|---|---|
| Fast heat-up and stable temperature | Drying efficiency depends on hot air temperature and how quickly the coil reaches it. |
| Compact internal space | The coil has to follow the duct and must not take space from other components. |
| Continuous operation and reliable sealing | Commercial and industrial washing equipment runs long shifts. A steam-side seal failure stops the line. |
| Batch consistency | Equipment makers build in batches and need coils that perform consistently and can be interchanged. |
We join the equipment development, build the coil to the duct and installation space, and validate heat-up performance and seal reliability on a prototype before series supply. Process and inspection are held consistent across batches.
Product development and endurance testing are complete. The coil is in stable series supply for tunnel washing and drying lines.
Steam heating coils supplied in series to a Japanese washing and drying equipment maker.
Send the medium, working conditions and installation envelope for an assessment.